Compressor
- Tamrotor E12 Rotary Screw
- Adaptable Compressor Speed
- Suction Pressure up to 50 PSI
- Discharge Pressure up to 250PSI
Driver
- Cummins 5.9 Natural Gas
- 70 BHP @1800 RPM
- Naturally Aspirated
- Gas Starter
Vessels and Piping
- 12” x 48” Inlet Separator
- 12” x 18” Blow Case
- 16” x 51” Gas/Oil Separator
- CRN Registered Vessels
- ASME B31.3 Pressure Piping
Skid and Building
- 8’x13’ Structural Skid
- 8’x13’x10’ Self-Framing Building
- Single Mandoor with window
- Double Mandoor for maintenance
- 24”x24” Catalytic, Natural Gas Heater
- Intake/Exhaust louvres
Typical Controls
- Murphy Panel (PIC-1021)
- Fisher Flow regulators
- Pressure and Temperature Shut-down Switches
- Oil Thermostatic Control Valve
Misc.
- Gas/Oil After Cooler
- Low Suction Recycle Regulator
- Sweet Gas Service
- Class 1 Div.2 Rated
Typical Applications
- Casing Gas Compression
- Fuel Gas Compression
- Blanket Gas Compression
Installation Requirements
Inlet Connection 2” NPT
Outlet Connection 2” NPT
Drain Connection 1” NPT
Wellhead Connection Either hard pipe or flexible hose may be used
Shipping Weight 12,000 lbs
The compressor package must be lifted and placed using a proper lifting device, consisting of a four-point lift (from each corner of the package). The package must remain level during lifting and placement. The unit cannot be skidded and dropped.
The customer is responsible to provide a suitable installation area. The compressor should be mounted on a flat and level bed of packed gravel. The use of planking alone is not recommended. This may cause unlevel settling of the package, unnecessary vibration, and increased sound pressure levels distributed through the skid base.
The compressor package must be grounded. The unit is supplied with a cable lug on skid edge to which the customer is responsible to attach a grounding device. It is recommended that an 8’ rod be wired to the grounding lug and inserted into the earth, within 6 feet of the compressor building.
Model E15S-137
Compressor
- RotorComp NK-60
- 20 HP Frame
- Suction Pressure 15 psi (103Kpa)
- Discharge Pressure 200psi(1379)
- Integrated Oil Sump
Driver
- Teco Westinghouse
- 15HP
- Three Phase TEXP Motor
Vessels and Piping
- Suction Scrubber Vessel
- Drain Pump Pneumatic/Electric
- CRN Registered Vessels
- ASME B31-3 Pressure Piping
Skid and Building
- Utilidor Self Frame Building
- Gas or Electric Heaters
- Classifications 1 Div 1 Or Div 2
Typical Controls
- Prologic PLC
- Switches for Suction and Discharge
- Oil Thermostatic Control Valve
Misc.
- Gas/Oil After Cooler
- Discharge Oil/Gas Separator
- Low Suction Recycle Regulator
Typical Applications
- Casing Gas Compression
- Fuel Gas Compression
- Blanket Gas Compression
Installation Requirements
The following information is to provide assistance for the customer in preparing for and ensuring optimal operation of the gas compressor package.
Inlet Connection 2” NPT
Outlet Connection 1” NPT
Wellhead Connection Either hard pipe or flexible hose may be used
Skid / Building Size Standard
Building 8’w x 10 ft long x 10’h
Skid Loading Eyes
8’w x 11ft long
Shipping Weight 9000 lbs
Lifting
The compressor package must be lifted and placed using a proper lifting device, consisting of a four-point lift (from each corner of the package). The package must remain level during lifting and placement. The unit cannot be skidded and dropped.